Ravine Drive Water Main Project



The bid opening for this project occured on April 27. For results, please see Project Results on QuestCDN.

The work consists of complete open cut installation of approximately 2000 feet of new 8-inch water main long Ravine Drive and Hawthorne Lane and service transfers to the new main.  The old main will be abandoned.  Also removal and replacement of approximately 900 feet of storm sewer is called for in this contract.  Approximately 4000 square yards of pavement within the water main and storm sewer limits will be reconstructed with new 6-inch full depth Hot Mix Asphalt over an 8-inch stone base with new concrete curb and gutter.  Outside of the water main and sewer limits the pavement will be milled and resurfaced.  Landscaped areas disturbed adjacent to the pavement will be restored with approximately 1900 square yards of sodding.