2017 Sidewalk Repair Program


This project opened on 7/14/2017.  To see results through QuestCDN, click on Project Results


Estimated quantities of proposed materials for the base bid are: 1410 SF of PCC Sidewalk, 5”, 240 SF of PCC Sidewalk, 6”, 7900 SF of Sidewalk Removal, 28 SF of Detectable Warnings (Special), 19 LF of Curb and Gutter R&R, 12 CY of Aggregate Subgrade Improvement, 8 Tons of Misc. HMA, 2507 SY of Topsoil 4”, Seeding with Erosion Control Blanket

Estimated quantities of proposed materials for 2 alternates are:

Alternate 1:  50 CY of Earth Excavation, 25 CY of Aggregate Subgrade Improvement, 80 SY of Sub-base Granular Material, Type B, 4”, 700 SF of PCC Sidewalk, 5”, 680 SF of Sidewalk Removal, 11.5 CY of Concrete Structures, 4 SY of Protective Coat, 720 Ibs of Epoxy Coated Reinforcement Bars, 120 SY of Topsoil, 4” with Sodding

Alternate 2: 1040 SF of PCC Sidewalk, 5”, 1040 SF of Sidewalk Removal, 116 SY of Sub-base Granular Material, Type B, 4”, 116 SY of Protective Coat, 2 CY of Concrete Structures, 250 Ibs of Epoxy Coated Reinforcement Bars, 80 Ea. DOWEL BARS 5/8", 2 Ea. Steel Seating Bench Removal and Replacement


For further information, please visit the Construction Projects page.