York Lane, Sunnyside Ave & Berkeley Rd Storm Sewer Improvements



The bid opening for this project occured on June 15. For results, please see Project Results on QuestCDN.

The work consists of complete open cut installation of a new storm sewer.

The base bid includes work along York Lane and Sunnyside Avenue as shown in the plans.  Proposed PVC SDR-26 pipe diameters and lengths vary from 12” at 29 feet and 18” at 611 feet.  84 feet 18” PVC C900 pipe is also included.  80 feet of water service lines will be replaced with 1 ½” of copper service line.  The pavement will be patched and overlaid with HMA where the trench is made for installation of the storm sewer and at locations noted in the plans.  Minor landscape restoration with sod will restore areas disturbed during construction.

An alternate bid includes items noted in the base bid PLUS items to complete storm sewer improvements along Berkeley Road from Sunnyside Avenue to Sherwood Road as noted in the plans.

The combined items for the base bid and alternate bid include PVC SDR-26 pipe sizes that vary in diameters and lengths with 12” at 160 feet, 15” at 38 feet, 18” at 611 feet, 24” at 19 feet, and 30” at 1,094 feet.  PVC C900 sizes and lengths include 18” at 611 feet, 21” at 26 feet, 24” at 19 feet and 30” at 194 feet.  360 feet of water service lines will be replaced with 1 ½” of copper service line.  The pavement will be patched and overlaid with HMA where the trench is made for installation of the storm sewer and at locations noted in the plans.  Minor landscape restoration with sod will restore areas disturbed during construction.