caption freeform

Charal Lane Roadway and Watermain Replacement Project



The bid opening for this project occured on June 2. For results, please see Project Results on QuestCDN.


The work consists of complete open cut installation of a 1,100 feet if new D.I.P. CL54, 8” water main.  4,250 square yards of existing concrete pavement will be completely removed.  A new full depth asphalt pavement consisting of 6 inches of HMA over an 8 inch stone base will replace the old PCC pavement.  2,270 feet of new B-6.12 curb and gutter is called out along the edge of pavement.  Approximately 242 feet of PVC SDR 26 storm sewer is included in this contract.  Disturbed area will be restored with 1,500 square yards of 4 inches of topsoil and sod.  The roadway will remain open to the public during construction.

An alternate bid is required and the alternate bid calls for lining 740 feet of existing 6 inch water main.  The existing water main is located in easements along private residential properties.  No excavation is anticipated in the residential areas where the lining is called for.


For further information, please visit the Construction Projects page.